The middle school prototype consists of four buildings connected by a courtyard, with four-story classroom and administration structures alongside single-story gymnasium and cafeteria buildings. The elementary school prototype includes three buildings linked by a one to two-story common area. LT also managed doors, door hardware, signage, and interior windows across all six schools, and led clash detection coordination among project disciplines.
The middle school prototype consists of four buildings connected by a courtyard, with four-story classroom and administration structures alongside single-story gymnasium and cafeteria buildings. The elementary school prototype includes three buildings linked by a one to two-story common area. LT also managed doors, door hardware, signage, and interior windows across all six schools, and led clash detection coordination among project disciplines.
By leading clash detection efforts and leveraging BIM 360 as a shared model environment, Leuterio Thomas streamlined coordination between structural, architectural, and MEP disciplines. This approach helped resolve interdisciplinary conflicts early and supported consistent implementation of the prototype designs across all six schools.